Post-Dredging Restoration Project

| Location: |
Medford, New Jersey |
|
|
| |
|
| Value: |
$
150,000.00 |
| |
|
Panther was contracted to excavate and remove a total of 83,000 cubic yards of lakebed sediments that over the years accumulated in the bottom of one large and three small lakes located in a private residential community. Lakebed excavation was performed up to the limits of residential bulkheads, docks, bridges, culverts and other structures. Access roads were constructed at strategic locations into the lakes to allow for truck loading.
Gabion rock check dams, floating turbidity barriers and silt fence were installed to minimize the discharge of sediment, sediment-laden water downstream of the project site. Upon the completion of all excavation activities, approximately 2,000 new plants and coir fiber logs were installed at various wetlands, uplands and the truck load-out locations. In addition, Panther installed approximately 4,000 square feet of a topsoil-filled Geoblock Porous Pavement System and various other erosion control measures at the access road locations. Panther also installed approximately 200 LF of new timber retaining wall bulkhead at one access location and repaired existing timber & gabion bulkheads at others. |
Additional Views |
|
|
| Back to Project Listings |

©
Panther Technologies, Inc. All rights reserved.
Sitemap