Illinois EPA Cap Project
hr

 

  task_4.jpg 
Location: Rosiclare, Illinois
 
 
   
Value: $ 280,000.00
   
Panther was contracted to install a 3-acre multilayer environmental cap system over a lead contaminated mine tailings area for this client in Rosiclare, Illinois. The project was completed from October though December 2000 and liner-welding services were performed utilizing special winter techniques, which allowed Panther to complete the project before the end of the year. The closure included a site survey, cleaning, stumping, rough grading, channel construction, barrier layer installation, 40 mil liner installation, drainage layer installation, top soil installation and seeding. During the course of the project, Panther managed rain events that generated large volumes of water in a short period of time. Panther successfully constructed diversion trenches to manage overflow and utilized a floating pump system, which was expeditiously set up to manage the majority of the water flow. The services were completed by our team of environmental professionals coordinated through Panther's Medford, New Jersey operations. During the bidding process, Panther was rated first technically and based on our alternate pricing, rated first in the cost category as well.

Additional Views

task_4.jpg

Back to Project Listings
bodybottom
© Panther Technologies, Inc. All rights reserved. Sitemap Sitemap